|БУДІВНИЦТВО ВОДОПРОВОДУ У | | | | | | | | | | | | | | |
|МІКРОРАЙОНІ ЖУЛЯНИ, | | | | | | | | | | | | | | |
|II-ГА ЧЕРГА | 1012,7| 1012,7| | 1012,7| | | | 1012,7| 1012,7 | | 1012,7| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|ВОДОПОСТАЧАННЯ С. РОМАНКІВ,| | | | | | | | | | | | | | |
|ОБУХІВСЬКИЙ РАЙОН | 779,0| 779,0| | 779,0| | | | 779,0| 779,0 | | 779,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|ВОДОПОСТАЧАННЯ ТА | | | | | | | | | | | | | | |
|КАНАЛІЗУВАННЯ | | | | | | | | | | | | | | |
|МАЛОПОВЕРХОВОЇ | | | | | | | | | | | | | | |
|ЗАБУДОВИ РАЙОНУ БІЛИЧІ | | | | | | | | | | | | | | |
|ТА НОВОБІЛИЧІ | 2000,0| 2000.0| | 2000,0| | | | 2000,0| 2000,0 | | 2000,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в тому числі: | | | | | | | | | | | | | | |
|проектні роботи | 390,0| 390,0| | 390,0| | | | 390,0| 390,0 | | 390,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|ВОДОПРОВІДНІ МЕРЕЖІ З | | | | | | | | | | | | | | |
|ВОДОЗАБОРОМ ІЗ | | | | | | | | | | | | | | |
|АРТЕЗІАНСЬКОЮ СВЕРДЛОВИНОЮ | | | | | | | | | | | | | | |
|В С. ЛІСНИКИ | 245,5| 245,5| | 245,5| | | | 245,5| 245,5 | | 245,5| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в тому числі: | | | | | | | | | | | | | | |
|проектні роботи | 45,5| 45,5| | 45,5| | | | 45,5| 45,5 | | 45,5| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|ВОДОПРОВІДНІ МЕРЕЖІ | | | | | | | | | | | | | | |
|ПРИВАТНОГО СЕКТОРА | | | | | | | | | | | | | | |
|С. БИКІВНЯ | 400,0| 400,0| | 400,0| | | | 400,0| 400,0 | | 400,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в тому числі: | | | | | | | | | | | | | | |
|проектні роботи | 105,0| 105,0| | 105,0| | | | 105,0| 105,0 | | 105,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|ВОДОПРОВІДНА СТАНЦІЯ N 1 | | | | | | | | | | | | | | |
|ДЕСНЯНСЬКОЇ ВОДОПРОВІДНОЇ | | | | | | | | | | | | | | |
|СТАНЦІЇ | 50,0| 50,0| | 50,0| | | | 50,0| 50,0 | | 50,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в тому числі: | | | | | | | | | | | | | | |
|проектні роботи | 50,0| 50,0| | 50,0| | | | 50,0| 50,0 | | 50,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|ЗАМІНА МЕРЕЖ ВОДОПРОВОДУ В | | | | | | | | | | | | | | |
|С.ПИРОГІВ | 288,6| 268,6| | 288,6| | | | 288,6| 288,6 | | 288,6| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в тому числі: | | | | | | | | | | | | | | |
|проектні роботи | 14,0| 14,0| | 14,0| | | | 14.0| 14,0 | | 14,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|ПОЛІПШЕННЯ ВОДОПОСТАЧАННЯ | | | | | | | | | | | | | | |
|МІКРОРАЙОНУ "РЕМБАЗА" | | | | | | | | | | | | | | |
|(I-ША ТА II-ГА ЧЕРГА) | 323,2| 323,2| | 323,2| | | | 323,2| 323,2 | | 323,2| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|РЕКОНСТРУКЦІЯ РЕЗЕРВУАРУ | | | | | | | | | | | | | | |
|ЧИСТОЇ ВОДИ 200000 КУБ.М | | | | | | | | | | | | | | |
|N 4 НС-3 ПІДЙОМУ | | | | | | | | | | | | | | |
|ДЕСНЯНСЬКОЇ ВОДОПРОВІДНОЇ | | | | | | | | | | | | | | |
|СТАНЦІЇ | 200,0| 200,0| | 200,0| | | | 200,0| 200,0 | | 200,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в тому числі: | | | | | | | | | | | | | | |
|проектні роботи | 100,0| 100,0| | 100,0| | | | 100,0| 100,0 | | 100,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|РЕКОНСТРУКЦІЯ РЕЗЕРВУАРУ | | | | | | | | | | | | | | |
|ЧИСТОЇ ВОДИ СМОРОДИНСЬКОЇ | | | | | | | | | | | | | | |
|ВОДОПРОВІДНОЇ СТАНЦІЇ | 200,0| 200,0| | 200,0| | | | 200,0| 200,0 | | 200.0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в тому числі: | | | | | | | | | | | | | | |
|проектні роботи | 100,0| 100,0| | 100,0| | | | 100,0| 100,0 | | 100,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|БУДІВНИЦТВО ВОДОПРОВІДНОЇ | | | | | | | | | | | | | | |
|МАГІСТРАЛІ Д-900 ММ | | | | | | | | | | | | | | |
|ВІД ВУЛ. ГЛИБОЧИЦЬКОЇ ДО | | | | | | | | | | | | | | |
|ВУЛ. ВОЛОДИМИРСЬКОЇ | 500,0| 500,0| | 500,0| | | | 500,0| 500,0 | | 500,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в тому числі: | | | | | | | | | | | | | | |
|проекті роботи | 500,0| 500,0| | 500,0| | | | 500,0| 500,0 | | 500,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|КОМПЛЕКС СПОРУД | | | | | | | | | | | | | | |
|АРТЕЗІАНСЬКОГО | | | | | | | | | | | | | | |
|ВОДОПОСТАЧАННЯ | | | | | | | | | | | | | | |
|"ОСОКОРКИ-ПІВНІЧНІ" ТА | | | | | | | | | | | | | | |
|ВОДОПРОВІДНОЇ МАГІСТРАЛІ ПО| | | | | | | | | | | | | | |
|ПР. ГРИГОРЕНКА | 1000,0| 1000,0| | 1000,0| | | | 1200,0| 1200,0 | | 1200,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в тому числі: | | | | | | | | | | | | | | |
|проектні роботи | 600,0| 600,0| | 600,0| | | | 600,0| 600,0 | | 600,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в т.ч. оплата за роботи, | | | | | | | | | | | | | | |
|виконані в 2002 році | | | | | | | | 200,0| 200,0 | | 200,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|ВОДОВІД ВІД ВУЛ. ДЕХТЯРЕНКА| | | | | | | | | | | | | | |
|ДО СМОРОДИНСЬКОЇ НАСОСНОЇ | | | | | | | | | | | | | | |
|СТАНЦІЇ | 200,0| 200,0| | 200,0| | | | 200.0| 200,0 | | 200.0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в тому числі: | | | | | | | | | | | | | | |
|проектні роботи | 200,0| 200,0| | 200,0| | | | 200.0| 200,0 | | 200.0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|АРТВОДОПОСТАЧАННЯ | | | | | | | | | | | | | | |
|Ж/М ТРОЄЩИНА, III-Я ЧЕРГА, | | | | | | | | | | | | | | |
|I-Й ПУСКОВИЙ КОМПЛЕКС | 100,0| 100,0| | 100,0| | | | 100,0| 100,0 | | 100,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в тому числі: | | | | | | | | | | | | | | |
|проектні роботи | 100,0| 100,0| | 100,0| | | | 100,0| 100,0 | | 100,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|Ж/М ВИГУРІВЩИНА-ТРОЄЩИНА, | | | | | | | | | | | | | | |
|БУРІННЯ ДОДАТКОВИХ | | | | | | | | | | | | | | |
|АРТЕЗІАНСЬКИХ СВЕРДЛОВИН, | | | | | | | | | | | | | | |
|ДІЛ. 25, 26 ТА | | | | | | | | | | | | | | |
|АРТЕЗІАНСЬКИЙ ВОДОПРОВІД | | | | | | | | | | | | | | |
|ВІД ВУЛ. БАЛЬЗАКА ДО | | | | | | | | | | | | | | |
|ПР. МАЯКОВСЬКОГО | 90,0| 90,0| | 90,0| | | | 90,0| 90,0 | | 90,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в тому числі: | | | | | | | | | | | | | | |
|проектні роботи | 90,0| 90,0| | 90,0| | | | 90,0| 90,0 | | 90,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|ПЕРЕКЛЮЧЕННЯ ВОДОПРОВІДНИХ | | | | | | | | | | | | | | |
|МЕРЕЖ Ж/М ПОЗНЯКИ-2 | | | | | | | | | | | | | | |
|(З-Д "БУРЕВІСНИК") | 500,3| 460,3| | 460,3| | | 40,0| 500,3| 460,3 | | 460,3| | | 40,0 |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в тому числі: | | | | | | | | | | | | | | |
|проектні роботи | 40,0| | | | | | 40,0| 40,0| | | | | | 40,0 |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|БУДІВНИЦТВО КАНАЛІЗАЦІЙНОГО| | | | | | | | | | | | | | |
|КОЛЕКТОРА ВІД МОСТИЦЬКОГО | | | | | | | | | | | | | | |
|ДО ГОЛОВНОГО МІСЬКОГО | | | | | | | | | | | | | | |
|(ПЕРШИЙ ЕТАП) | 500,0| 500,0| 500,0| | | | | 500,0| 500,0 | 500,0| | | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в тому числі: | | | | | | | | | | | | | | |
|проектні роботи | 500,0| 500,0| 500,0| | | | | 500,0| 500,0 | 500,0| | | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|БУДІВНИЦТВО КАНАЛІЗАЦІЙНОГО| | | | | | | | | | | | | | |
|КОЛЕКТОРА У С. ШЕВЧЕНКОВЕ | | | | | | | | 759,2| 759,2 | | 759,2| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в т.ч. оплата за роботи, | | | | | | | | | | | | | | |
|виконані в 2002 році | | | | | | | | 759,2| 759,2 | | 759,2| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|ДРУГА НИТКА ГОЛОВНОГО | | | | | | | | | | | | | | |
|МІСЬКОГО КАНАЛІЗАЦІЙНОГО | | | | | | | | | | | | | | |
|КОЛЕКТОРА | 3000,0| 3000,0| 3000,0| | | | | 3000,0| 3000,0 | 3000,0| | | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в тому числі: | | | | | | | | | | | | | | |
|проектні роботи | 800,0| 800,0| 800,0| | | | | 800,0| 800,0 | 800,0| | | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|КАНАЛІЗУВАННЯ ІСНУЮЧОЇ | | | | | | | | | | | | | | |
|ЗАБУДОВИ СЕЛИЩА БИКІВНЯ | 2630,2| 2630,2| | 2630,2| | | | 2630,2| 2630,2 | | 2630,2| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в тому числі: | | | | | | | | | | | | | | |
|проектні роботи | 172,3| 172,3| | 172,3| | | | 172,3| 172,3 | | 172,3| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|ПІВДЕННО-ЗАХІДНИЙ | | | | | | | | | | | | | | |
|КАНАЛІЗАЦІЙНИЙ КОЛЕКТОР, | | | | | | | | | | | | | | |
|I-Й - II-Й ПУСКОВИЙ | | | | | | | | | | | | | | |
|КОМПЛЕКС | 7000,0| 7000,0| 7000,0| | | | | 7000,0| 7000,0 | 7000,0| | | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в тому числі: | | | | | | | | | | | | | | |
|проектні роботи | 80,0| 80,0| 80,0| | | | | 80,0| 80,0 | 80,0| | | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|ПЕРЕКЛАДКА НАПІРНОГО | | | | | | | | | | | | | | |
|КАНАЛІЗАЦІЙНОГО КОЛЕКТОРА | | | | | | | | | | | | | | |
|ВІД КАНАЛІЗАЦІЙНОЇ | | | | | | | | | | | | | | |
|НАСОСНОЇ СТАНЦІЇ Ж/М | | | | | | | | | | | | | | |
|СВЯТОШИН | 150,0| 150,0| | 150,0| | | | 150,0| 150,0 | | 150,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в тому числі: | | | | | | | | | | | | | | |
|проектні роботи | 150,0| 150,0| | 150,0| | | | 150,0| 150,0 | | 150,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|РЕКОНСТРУКЦІЯ ВИБОРЗЬКОГО | | | | | | | | | | | | | | |
|КАНАЛІЗАЦІЙНОГО КОЛЕКТОРА | | | | | | | | | | | | | | |
|Д=1500 ММ | 4200,0| 4200,0| | 4200,0| | | | 4200,0| 4200.0 | | 4200,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в тому числі: | | | | | | | | | | | | | | |
|проектні роботи | 270,0| 270,0| | 270,0| | | | 270,0| 270,0 | | 270.0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|РЕКОНСТРУКЦІЯ | | | | | | | | | | | | | | |
|НОВО-ДАРНИЦЬКОГО | | | | | | | | | | | | | | |
|КАНАЛІЗАЦІЙНОГО КОЛЕКТОРА | | | | | | | | | | | | | | |
|3 КАМЕРАМИ ГАСІННЯ | | | | | | | | | | | | | | |
|(II-ГА ЧЕРГА) | 4000,0| 4000,0| | 4000,0| | | | 4000,0| 4000,0 | | 4000,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в тому числі: | | | | | | | | | | | | | | |
|проектні роботи | 267,7| 267,7| | 267,7| | | | 267,7| 267,7 | | 267,7| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|РЕКОНСТРУКЦІЯ | | | | | | | | | | | | | | |
|ПІВНІЧНО-ДАРНИЦЬКОГО | | | | | | | | | | | | | | |
|КАНАЛІЗАЦІЙНОГО КОЛЕКТОРА | 5268,0| 5268,0| | 5268,0| | | | 5568,0| 5568,0 | | 5568,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в тому числі: | | | | | | | | | | | | | | |
|проектні роботи | 163.7| 163,7| | 163,7| | | | 163,7| 163,7 | | 163,7| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в т. ч. оплата за роботи, | | | | | | | | | | | | | | |
|виконані в 2002 році | | | | | | | | 300,0| 300.0 | | 300.0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|РЕКОНСТРУКЦІЯ СИРЕЦЬКОГО | | | | | | | | | | | | | | |
|КАНАЛІЗАЦІЙНОГО КОЛЕКТОРА | 4000,0| 4000,0| 1100,0| 2900,0| | | | 4200,0| 4200,0 | 1300,0| 2900,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в тому числі: | | | | | | | | | | | | | | |
|проектні роботи | 370,0| 370,0| 370,0| | | | | 370,0| 370,0 | 370,0| | | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в т. ч. оплата за роботи, | | | | | | | | | | | | | | |
|виконані в 2002 році | | | | | | | | 200,0| 200,0 | 200,0| | | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|БУДІВНИЦТВО КАНАЛІЗАЦІЙНОГО| | | | | | | | | | | | | | |
|КОЛЕКТОРА ПО | | | | | | | | | | | | | | |
|ВУЛ. АЛМА-АТИНСЬКІЙ | 8961.3| 8961,3| 2542.5| 6418,8| | | | 9961,3| 9961,3 | 3542,5| 6418.8| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в тому числі: | | | | | | | | | | | | | | |
|проектні роботи | 91.0| 91,0| 91,0| | | | | 91.0| 91,0 | 91,0| | | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в т. ч. оплата за роботи, | | | | | | | | | | | | | | |
|виконані в 2002 році | | | | | | | | 1000,0| 1000,0 | 1000,0| | | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|КАНАЛІЗАЦІЙНИЙ КОЛЕКТОР | | | | | | | | | | | | | | |
|ПО ПР.БАЖАНА ВІД | | | | | | | | | | | | | | |
|НОВО-ДАРНИЦЬКОГО ДО | | | | | | | | | | | | | | |
|ЛІВОБЕРЕЖНОГО (III-Й | | | | | | | | | | | | | | |
|ПУСКОВИЙ КОМПЛЕКС) | 700,0| 700,0| | 700,0| | | | 700,0| 700,0| | 700,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в тому числі: | | | | | | | | | | | | | | |
|проектні роботи | 93,7| 93,7| | 93,7| | | | 93,7| 93,7| | 93,7| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|РЕКОНСТРУКЦІЯ | | | | | | | | | | | | | | |
|КАНАЛІЗАЦІЙНОГО | | | | | | | | | | | | | | |
|КОЛЕКТОРА ПО | | | | | | | | | | | | | | |
|ВУЛ. ДЕХТЯРЕНКА | 500.0| 500,0| | 500,0| | | | 500,0| 500,0| | 500,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в тому числі: | | | | | | | | | | | | | | |
|проектні роботи | 150,0| 150,0| | 150,0| | | | 150,0| 150,0| | 150,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|РЕКОНСТРУКЦІЯ ПЕРШОГО | | | | | | | | | | | | | | |
|ПУСКОВОГО КОМПЛЕКСУ | | | | | | | | | | | | | | |
|КАНАЛІЗАЦІЙНОГО КОЛЕКТОРА | | | | | | | | | | | | | | |
|ПО ВУЛ. ЖИЛЯНСЬКІЙ (ВІД | | | | | | | | | | | | | | |
|ВУЛ. ТОЛСТОГО ДО | | | | | | | | | | | | | | |
|ВУЛ. ТАРАСІВСЬКОЇ) | 800,1| 800,1| | 800,1| | | | 800,1| 800,1| | 800,1| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|БУДІВНИЦТВО КАНАЛІЗАЦІЇ | | | | | | | | | | | | | | |
|ЩИТОВОЮ ПРОХОДКОЮ | | | | | | | | | | | | | | |
|Д=1200 ММ ПО | | | | | | | | | | | | | | |
|ВУЛ. ЗДОЛБУНІВСЬКІЙ | | | | | | | | 500,0| 500.0| | 500.0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в т.ч. оплата за роботи, | | | | | | | | | | | | | | |
|виконані в 2002 році | | | | | | | | 500,0| 500,0| | 500,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|КАНАЛІЗАЦІЙНІ МЕРЕЖІ ПО | | | | | | | | | | | | | | |
|ВУЛ. О.КОШОВОГО ТА | | | | | | | | | | | | | | |
|ВУЛ. АРМІЙСЬКІЙ | 800,0| 800,0| | 800.0| | | | 800.0| 800,0| | 800,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|КАНАЛІЗАЦІЙНИЙ КОЛЕКТОР | | | | | | | | | | | | | | |
|ПО ВУЛ. МОЛОЧАНСЬКІЙ | 8700,0| 8700,0| 5450,0| 3250,0| | | | 8700,0| 8700,0| 5450,0| 3250,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в тому числі: | | | | | | | | | | | | | | |
|проектні роботи | 50,0| 50,0| 50,0| | | | | 50,0| 50,0| 50,0| | | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|КАНАЛІЗАЦІЙНИЙ КОЛЕКТОР | | | | | | | | | | | | | | |
|ПО ВУЛ. РОСІЙСЬКІЙ | 1000,0| 1000,0| | 1000.0| | | | 1000,0| 1000.0| | 1000,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в тому числі: | | | | | | | | | | | | | | |
|проектні роботи | 200,0| 200,0| | 200,0| | | | 200,0| 200,0| | 200,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|КАНАЛІЗАЦІЙНИЙ КОЛЕКТОР | | | | | | | | | | | | | | |
|ПО ВУЛ. ХРЕЩАТИК ВІД | | | | | | | | | | | | | | |
|БЕССАРАБСЬКОЇ ПЛОЩІ ДО | | | | | | | | | | | | | | |
|ВУЛ. ГОРОДЕЦЬКОГО | | | | | | | | 1500,0| 1500,0| 1500,0| | | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|в т.ч. оплата за роботи, | | | | | | | | | | | | | | |
|виконані в 2002 році | | | | | | | | 1500,0| 1500,0| 1500,0| | | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|КАНАЛІЗАЦІЯ ВУЛ. ЖИЛОЇ, | | | | | | | | | | | | | | |
|ЩИТОВА ПРОХОДКА 3 | | | | | | | | | | | | | | |
|ВОДОПОНИЖЕННЯМ. | | | | | | | | | | | | | | |
|Ж/М ПОЗНЯКИ, 9 М-Н | 1600,0| 1600,0| | 1600,0| | | | 1600,0| 1600,0| | 1600,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|ГАЗОПОСТАЧАННЯ | | | | | | | | | | | | | | |
|С.КРЕНИЧІ | | | | | | | | | | | | | | |
|ОБУХІВСЬКОГО РАЙОНУ | 432,4| 432,4| | 432.4| | | | 432,4| 432,4| | 432,4| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|ГАЗОПОСТАЧАННЯ С. ПІДГІРЦІ | | | | | | | | | | | | | | |
|ОБУХІВСЬКОГО РАЙОНУ | 715,7| 715,7| | 715,7| | | | 715,7| 715,7| | 715,7| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|БУДІВНИЦТВО АВТОШЛЯХІВ | | | | | | | | | | | | | | |
|В С.РОМАНКІВ | | | | | | | | | | | | | | |
|ОБУХІВСЬКОГО РАЙОНУ | 200,0| 200,0| | 200,0| | | | 200,0| 200,0| | 200,0| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|КАПІТАЛЬНИЙ РЕМОНТ | | | | | | | | | | | | | | |
|АВТОШЛЯХІВ ВІД | | | | | | | | | | | | | | |
|С. ХОДОСІЇВКА ДО ПОЛІГОНУ | | | | | | | | | | | | | | |
|N 5 ОБУХІВСЬКОГО РАЙОНУ | 455,8| 455,8| | 455,8| | | | 455,8| 455,8| | 455,8| | | |
|---------------------------+---------+---------+--------+--------+------------+-------+--------+--------+---------+--------+--------+-----------+---------+--------|
|КАПІТАЛЬНИЙ РЕМОНТ ТА НОВЕ | | | | | | | | | | | | | | |
|БУДІВНИЦТВО АВТОШЛЯХІВ В | | | | | | | | | | | | | | |
|С.КРЕНИЧІ ОБУХІВСЬКОГО | | | | | | | | | | | | | | |
|РАЙОНУ | 200,0| 200,0| | 200.0| | | | 200,0| 200,0| | 200,0| | | |